Package XL-01: Construction and Technical Design Drawings Section : Km0+000 +Km 15+000 (including bridges: Lai Phuoc, Khe Ai Tu, Over cross TL579)
Place: Cam Lo – La Son
Representatives of investor: PMU HoChiMinh road
Total contract value: 547,465 Billions VND
Contract duration: From Aug 2018 to Aug 2021